Roast Planner

Manual Roast Plan — Worksheet Sheet 1 of 2 · Plan | Hottop KN-8828B-2K+
THE COFFEE[n.n] = field ID · cited everywhere it feeds a number
0.1Coffee / lot |0.2Date |0.3Batch # |0.4Green in g
11.1Cultivar |1.2Group |1.3Origin
1.4FC anchor |1.5Profile mm:ss|mm:ss|mm:ss |your cultivar's row, Step 1 — not a group number
1.6± Refine → ledger 2 0 first cook, else Step 12 |1.7± Dev mod → ledger 9 Step 1's profile 3rd # −1:30
33.1Process |3.2Dev mod → ledger 8 Step 3 table
44.1Roast level |4.2Target WL % |4.3Dev base → ledger 7
55.1Moisture % |5.2Density g/L |5.3Altitude |5.4Screen |5.5Sweet
5.6± Net correction → ledger 3 judgment, rarely >±0:15
2 · BLENDskip if single-origin → Step 2
2.1This lot is:
2.2ComponentGroupProcess Share %FC anchor
2.3Method:
2.4Resulting FC anchor → ledger line 1 |2.5Resulting processing modifier → ledger line 8
6 · TIME LEDGERmethod & why → Step 6
1Cultivar/blend anchor from 1.4, or 2.4 if blend
2± Refinement — from 1.6 0 first cook, else Step 12
3± Bean condition — from 5.6
4± Batch size vs. Step 9 reference weights 225 g ≈ 1:30–2:00 later than 200 g
AFIRST CRACK
B · YELLOW / MAILLARD — informational only. NOT summed into C.
5YELLOW = A × 0.56
6MAILLARD = A − line 5
C · DEVELOPMENT — sum ONLY rows 7 + 8 + 9
7Development base — from 4.3
8± Processing modifier — from 3.2, or 2.5 if blend
9± Cultivar dev modifier — from 1.7
CDEVELOPMENT = 7 + 8 + 9 only
DDROP (end of roast) = A + C
7 · SANITY CHECKSa fail sends you back to box 6 → Step 7
CheckShould be YoursPass?Failure means
Drying share43–51 % high = late yellow · low = rushed
Maillard share33–39 % low = too little browning
Development ratio12–20 % under 12 % = under-developed
Development ceiling< 4:30 over 4:30 mutes any roast
Roast & Record Sheet 2 of 2 | coffee:
8 · TEMPERATURES & RATE-OF-RISE→ Step 8
MilestoneTime °CYour logged band
Charge0:00 133–195 °C
Turning point 77–100 °C @ 0:47–1:15
Yellow 148–166 °C
First crack 176–187 °C
Drop 183–197 °C light
9 · ACTUATOR SCHEDULE (planned)→ Step 9
TimeHeat % Fan %Expected BTWhy this change
10 · THE CURVEplan drawn live · reference from an .alog if attached → Step 10
your first-crack band, 176–187 °C 6080100 120140160 180200 BEAN TEMP °C 0:001:002:00 3:004:005:00 6:007:008:00 9:0010:0011:00 12:0013:0014:00 15:00 TIME FROM CHARGE · solid = plan · dashed = reference (.alog)
11 · AT THE MACHINE — PLAN vs ACTUAL→ Step 11
MilestonePlan time Actual timeActual BTNote
Charge0:00
Turning point
Yellow
First crack
Drop
12 · AFTER THE ROAST→ Step 12
Green in g |Out g |Weight loss % |Actual DTR %
Colour WB/GR |Rested days |Brew ratio |Method
Cup notes
One change next batch |What would prove it wrong