Manual Roast Plan — WorksheetSheet 1 of 2 · Plan | Hottop KN-8828B-2K+
THE COFFEE[n.n] = field ID · cited everywhere it feeds a number
0.1Coffee / lot|0.2Date|0.3Batch #|0.4Green in
g 11.1Cultivar|1.2Group|1.3Origin 1.4FC anchor|1.5Profile mm:ss|mm:ss|mm:ss|your cultivar's row, Step 1 — not a group number 1.6± Refine → ledger 2
0 first cook, else Step 12
|1.7± Dev mod → ledger 9
Step 1's profile 3rd # −1:30 33.1Process|3.2Dev mod → ledger 8
Step 3 table 44.1Roast level|4.2Target WL
%
|4.3Dev base → ledger 7 55.1Moisture
%
|5.2Density
g/L
|5.3Altitude|5.4Screen|5.5Sweet 5.6± Net correction → ledger 3
judgment, rarely >±0:15
2 · BLENDskip if single-origin → Step 2
2.1This lot is:
2.2Component
Group
Process
Share %
FC anchor
2.3Method:
2.4Resulting FC anchor → ledger line 1|2.5Resulting processing modifier → ledger line 8
6 · TIME LEDGERmethod & why → Step 6
1
Cultivar/blend anchor
from 1.4, or 2.4 if blend
2
± Refinement — from 1.6
0 first cook, else Step 12
3
± Bean condition — from 5.6
4
± Batch size vs. Step 9 reference
weights
225 g ≈ 1:30–2:00 later than 200 g
Timing subtotal
× Machine pace
learned from your own roasts, else ×1.00
(reference)
A
FIRST CRACK
B · YELLOW / MAILLARD — informational only. NOT summed
into C.
5
YELLOW = A × 0.56
6
MAILLARD = A − line 5
C · DEVELOPMENT — sum ONLY rows 7 + 8 + 9
7
Development base — from 4.3
8
± Processing modifier — from 3.2,
or 2.5 if blend
9
± Cultivar dev modifier — from 1.7
C
DEVELOPMENT = 7 + 8 + 9 only
D
DROP (end of roast) = A + C
7 · SANITY CHECKSa fail sends you back to box 6 → Step 7
Check
Should be
Yours
Pass?
Failure means
Drying share (informational)
43–51 %
can't fail on its own — see * below
Maillard share (informational)
33–39 %
can't fail on its own — see * below
Development ratio
12–20 %
under 12 % = under-developed
Development ceiling
< 4:30
over 4:30 mutes any roast
* Drying share and Maillard share are always in-band
whenever Development ratio passes — yellow is calculated as
a fixed 56% of first crack, not measured independently, so
these two rows can't fail on their own. Only Development
ratio and Development ceiling are real pass/fail checks.
Roast & RecordSheet 2 of 2 | coffee:
8 · TEMPERATURES & RATE-OF-RISE→ Step 8
Milestone
Time
°C
Your logged band
Charge
133–195 °C
Turning point
77–100 °C @ 0:47–1:15
Yellow
148–166 °C
First crack
176–187 °C
Drop
183–197 °C light
9 · ACTUATOR SCHEDULE (planned)→ Step 9
Time
Heat %
Fan %
Expected BT
Why this change
10 · THE CURVEplan drawn live · reference from an .alog if attached → Step
10
11 · AT THE MACHINE — PLAN vs ACTUAL→ Step 11
Milestone
Plan time
Actual time
Actual BT
Note
Charge
Turning point
Yellow
First crack
Drop
12 · AFTER THE ROAST→ Step 12
Green in
g |Out
g |Weight loss
% |Actual DTR
% Colour WB/GR|Rested
days |Brew ratio|Method Cup notes One change next batch|What would prove it wrong