Commit Graph
2 Commits
Author SHA1 Message Date
Shane MaynardandClaude Fable 5 eb82263ead Add finished-roast .alog uploads with Pi agent deep review and /roasts history
Test and deploy / test-and-deploy (push) Successful in 1m39s
- POST /api/roasts stores the original .alog verbatim (multiple per plan),
  parses it server-side, and kicks off an async zero-tool Pi agent review
  (grade, highlights, concerns, next-batch suggestions, plan-vs-actual)
- /roasts page: table of historical actual roasts with review summaries;
  row detail renders the BT curve as SVG with the plan curve overlaid,
  shows the full review, and offers original-.alog backup download,
  re-evaluate, and delete
- Planner's Reference curve drawer gains a multi-file finished-roast
  uploader that attaches to the open (synced) plan
- Failed reviews record the error on the row and are retryable via
  POST /api/roasts/:id/evaluate (e.g. once a model is configured)

Co-Authored-By: Claude Fable 5 <[email protected]>
2026-08-08 20:18:22 -04:00
snowspeeder 59645e59b5 Add green-bean inventory and cupping features
Ports inventory management and SCA-style cupping scoring from
hope_roaster: lot tracking with audit-logged consumption, cupping
sessions with server-authoritative scoring and a live radar chart,
and links from the planner (draw-from-lot, open-cupping-session).

Also fixes the Blend/Single-origin toggle layout, replaces tooltips
with an in-context "why" teaching layer, and stages the planner UI
into pre-roast vs. post-roast phases.
2026-07-30 14:47:15 -04:00