Roast Planner
Prefill from URL
Reference curve (.alog)
Load plan
Download plan
Print
Prefill from a bean product URL
overwrite filled fields
Fetch & prefill
Undo prefill
Attach an Artisan .alog as a reference curve
Choose .alog file
Show local library
Manual Roast Plan — Worksheet
Sheet 1 of 2 · Plan | Hottop KN-8828B-2K+
THE COFFEE
[n.n] = field ID · cited everywhere it feeds a number
0.1
Coffee / lot
|
0.2
Date
|
0.3
Batch #
|
0.4
Green in
g
1
1.1
Cultivar
|
1.2
Group
Typica
Bourbon
Ethiopian
Hybrid
|
1.3
Origin
1.4
FC anchor
|
1.5
Profile mm:ss|mm:ss|mm:ss
|
your cultivar's row, Step 1 — not a group number
1.6
± Refine → ledger 2
0 first cook, else Step 12
|
1.7
± Dev mod → ledger 9
Step 1's profile 3rd # −1:30
3
3.1
Process
washed
yellow/white honey
red/black honey
natural
anaerobic/CM
|
3.2
Dev mod → ledger 8
Step 3 table
4
4.1
Roast level
light
light-med
medium
dark
very dark
|
4.2
Target WL
%
|
4.3
Dev base → ledger 7
5
5.1
Moisture
%
|
5.2
Density
g/L
|
5.3
Altitude
|
5.4
Screen
|
5.5
Sweet
narrow
med
wide
5.6
± Net correction → ledger 3
judgment, rarely >±0:15
2 · BLEND
skip if single-origin → Step 2
2.1
This lot is:
single-origin — skip this box
blend or community lot
2.2
Component
Group
Process
Share %
FC anchor
2.3
Method:
dominant (≥60%)
weighted average
split-roast, blend after
2.4
Resulting FC anchor → ledger line 1
|
2.5
Resulting processing modifier → ledger line 8
6 · TIME LEDGER
method & why → Step 6
1
Cultivar/blend anchor
from 1.4, or 2.4 if blend
—
2
±
Refinement — from 1.6
0 first cook, else Step 12
—
3
±
Bean condition — from 5.6
—
4
±
Batch size vs. Step 9 reference weights
225 g ≈ 1:30–2:00 later than 200 g
A
FIRST CRACK
—
B · YELLOW / MAILLARD — informational only. NOT summed into C.
5
YELLOW
= A × 0.56
—
6
MAILLARD
= A − line 5
—
C · DEVELOPMENT — sum ONLY rows 7 + 8 + 9
7
Development base — from 4.3
—
8
±
Processing modifier — from 3.2, or 2.5 if blend
—
9
±
Cultivar dev modifier — from 1.7
—
C
DEVELOPMENT
= 7 + 8 + 9 only
—
D
DROP (end of roast)
= A + C
—
7 · SANITY CHECKS
a fail sends you back to box 6 → Step 7
Check
Should be
Yours
Pass?
Failure means
Drying share
43–51 %
—
high = late yellow · low = rushed
Maillard share
33–39 %
—
low = too little browning
Development ratio
12–20 %
—
under 12 % = under-developed
Development ceiling
< 4:30
—
over 4:30 mutes any roast
Roast & Record
Sheet 2 of 2 | coffee:
8 · TEMPERATURES & RATE-OF-RISE
→ Step 8
Milestone
Time
°C
Your logged band
Charge
0:00
133–195 °C
Turning point
77–100 °C @ 0:47–1:15
Yellow
—
148–166 °C
First crack
—
176–187 °C
Drop
—
183–197 °C light
9 · ACTUATOR SCHEDULE (planned)
→ Step 9
Time
Heat %
Fan %
Expected BT
Why this change
10 · THE CURVE
plan drawn live · reference from an .alog if attached → Step 10
your first-crack band, 176–187 °C
60
80
100
120
140
160
180
200
BEAN TEMP °C
0:00
1:00
2:00
3:00
4:00
5:00
6:00
7:00
8:00
9:00
10:00
11:00
12:00
13:00
14:00
15:00
TIME FROM CHARGE · solid = plan · dashed = reference (.alog)
11 · AT THE MACHINE — PLAN vs ACTUAL
→ Step 11
Milestone
Plan time
Actual time
Actual BT
Note
Charge
0:00
Turning point
—
Yellow
—
First crack
—
Drop
—
12 · AFTER THE ROAST
→ Step 12
Green in
g
|
Out
g
|
Weight loss
%
|
Actual DTR
%
Colour WB/GR
|
Rested
days
|
Brew ratio
|
Method
Cup notes
One change next batch
|
What would prove it wrong